November 4, 2026 Understand what changes. Find what to use.

MarketNews1 source

AI data centers turn to converted jet engines for power

Some AI data centers are turning to jet engines removed from retired aircraft and converted to burn natural gas, according to The New York Times, cited by TechCrunch. The alternative can be brought online faster: Rystad Energy analyst Audun Martinsen told the Times that the units can get a data center running in 24 months, while connecting 100 megawatts to the grid in Northern Virginia takes about seven years, according to the International Energy Agency.

xAI has already installed eight such turbines in Mississippi to help power Colossus 2, the Times reported, and OpenAI used gas turbines at its first Stargate site in Texas in 2025. Crusoe ordered 13 units but walked away from a $1.25 billion deal for 29 turbines. The converted engines are less efficient and more polluting than conventional turbines, potentially making them a short-term solution.

Why it matters · editorial interpretation

The alternative may shorten the time needed to power data centers, but the converted turbines’ lower efficiency and higher pollution create a significant trade-off between deployment speed and environmental impact. The cited cases also suggest that AI infrastructure projects are turning to nonstandard energy solutions while awaiting grid connections.

Sources

Hardware

One story, many sources

Coverage of the same story gathered in one item, with a link to each original.

Summary and interpretation apart

What the sources say stays in the summary; editorial context is labeled separately.

Always with the source

Every story links to the original articles, and the full content belongs to them.